New Orleans allows a maximum of one residential short-term rental per city square, owned only by a natural person, with an operator living on site. When more than one applicant wants the same square, the city holds a lottery, live-streamed and drawn with a bingo machine. Every unit needs two permits, an Owner permit and an Operator permit, and all licenses expire on June 30 each year. The rules date to ordinances effective July 1, 2023, and they got tighter in September 2024 when the special-exception path around the cap was discontinued.
The eligibility gauntlet
The city defines a short-term rental as renting any part of a residential dwelling "for dwelling, lodging or sleeping purposes to one party with duration of occupancy of less than thirty (30) consecutive days." For the residential category the city calls an NSTR (non-commercial short-term rental), the rules from the city's official training materials and program pages (nola.gov) stack up like this:
- The owner must be a human being"Only natural persons aged 18 or over may own a property used as a non-commercial short term rental. Ownership, in whole or in part, by a business entity, or any other juridical person is prohibited." No LLCs, no trusts, no corporations, not even partial stakes.City NSTR training materials, 2025 cycle
- One property, one permit, per person"No person may possess more than one short-term rental owner permit or own, in whole or in part, more than one property used as a non-commercial short-term rental." Portfolios of residential STRs are structurally impossible here.City NSTR training materials
- The operator lives thereThe application checklist requires the operator to live on site, with the property address on their photo ID. In single-family homes, one bedroom must be reserved for the owner's full-time occupancy.City NSTR application checklist; STR program overview
- The square must be open"A maximum of 1 NSTR or Bed & Breakfast (B&B) may be permitted per square." A square is a city block. If a square already has one, you are simply ineligible: "As of September 19, 2024, the Special Exception process has been discontinued. If there is an NSTR License on your square, you are not eligible for the NSTR Lottery."City NSTR training materials; CCNO Sec. 26-617(g)
- The zone must allow itEligibility runs off a defined list of zoning districts (the city's checklist enumerates them, from HU-RS through the CBD districts, including VCE in the French Quarter area). Outside the listed zones, no residential permit issues.City NSTR training materials, eligible-zones checklist
- The unit is capped at 3 bedrooms, 6 guestsThe application requires "a floor plan (max 3 bedrooms for 6 guests)." Larger operations belong in the commercial (CSTR) category, in commercial zones, with commercial fees.City NSTR training materials
Both permits are required per unit: "Every STR unit in Orleans Parish must have both an Owner permit and an Operator permit associated with it" (city operator-permit page, citing CCNO Sections 26-618 and 26-624 and the Comprehensive Zoning Ordinance).
The lottery, run like a raffle because it is one
Contested squares go to a drawing. The city's lottery rules are unusually concrete about the mechanics: "Lotteries will be held on a per-square basis, meaning that lotteries will only be held for squares where more than one complete NSTR application has been submitted," and "Lotteries will be live-streamed via Zoom, YouTube, and/or other similar technology. Lotteries will utilize a bingo or other comparable machine to ensure fairness." Winners have five calendar days to pay their fees or forfeit to the next name drawn. Lotteries run quarterly, with fees prorated by how much of the license year is left, and a license won in any quarter still expires the same June 30.
The city's fee documents disagree on the total
The city's published fee schedule lists the NSTR owner permit at $125 and the operator permit at $150, plus a $50 non-refundable application fee ($325 all-in). Its lottery rules describe "full fees" for a July winner as $500, prorated to $375, $250, and $125 across later quarters. Both are official city documents, live as of August 2026. Budget to the higher figure and confirm the current amount with the STR Administration office before applying.
What operating one costs the city, per night and per year
According to the city's STR taxes and fees page (nola.gov), a permitted rental pays layered nightly charges on top of the annual permits:
All of it is collected and processed by the Department of Finance, Bureau of Revenue, regardless of how a platform remits. On the compliance side, the application's sworn attestations put the safety burden on the operator: "The dwelling unit has working smoke detectors inside and outside every bedroom, carbon monoxide alarms outside every bedroom, and a properly maintained and charged fire extinguisher on all habitable floors," plus insurance meeting City Code Sec. 26-618(A)(1), and a commitment that "the operator will complete a visual inspection daily to verify the dwelling unit and guest(s) are in compliance." Commercial CSTRs additionally require a noise monitoring device, mandatory since July 1, 2023.
Enforcement money is the one place the regime is mild on paper: "These fines are set by state law at a maximum of $1000 for each violation cited in a violation case." The real penalty is structural, because a revoked or lapsed license sends the square back into the next quarterly lottery, and licenses are non-transferable, so there is no buying your way back in.
The June 30 clock
Every NSTR license in the city expires on the same date, June 30, renewable up to 30 days before expiration. Miss the renewal window and the square reopens to the lottery, which on a contested square means your own block's other applicants get a shot at the permit you built a calendar around. For anyone modeling revenue here, that makes New Orleans the rare market where the compliance calendar, not the booking calendar, is the load-bearing one: a three-bedroom cap, roughly 11.75% in parish taxes plus $5 a night, an annual all-in permit cost in the low hundreds, and a permit that must be actively re-won every year.
Against the other heavily-regulated markets we have covered, New Orleans is the most restrictive on ownership structure of any major US city: San Diego caps citywide volume but lets anyone hold a license, and Palm Springs caps by neighborhood percentage. New Orleans caps by the individual block and bans corporate ownership outright.
Quick FAQ
How many short-term rentals does New Orleans allow per block?
One residential STR or bed and breakfast per city square. Contested squares go to a quarterly, live-streamed lottery drawn with a bingo machine. Since September 19, 2024, there is no special-exception path to a second permit on a square.
Can an LLC own a short-term rental in New Orleans?
Not a residential one. Only natural persons 18 or over may own an NSTR property; any business-entity ownership, even partial, is prohibited. One owner permit and one NSTR property per person, with the operator living on site.
What permits are required?
Two per unit: an Owner permit and an Operator permit. The city's fee schedule lists the NSTR owner permit at $125, the operator permit at $150, and a $50 application fee; commercial CSTR operator permits are $1,000. All licenses expire June 30 and are non-transferable.
What taxes and fees apply?
A $5 per-night occupancy fee for residential STRs ($12 commercial), a 5% parish gross rentals tax, a 6.75% parish occupancy tax, and a 50-cent nightly occupancy privilege fee, all remitted through the Bureau of Revenue. Violations carry fines up to $1,000 each under state law.
Sources
Sources are named at the publisher level with their root domain, rather than linked or titled; every figure is verifiable at the named source. Code citations are kept precise because legal claims are not credible without them; every quoted phrase was read in the city's live pages and official training materials on August 31, 2026.
- Short-term rental program pages: overview, operator permits, lotteries, and taxes and fees, City of New Orleans, 2026 (implementing CCNO Ch. 26, Secs. 26-617, 26-618, 26-624, and the Comprehensive Zoning Ordinance, per Ordinances 29381 and 29382 MCS)nola.gov
- Official NSTR required-training materials, City of New Orleans Department of Safety and Permits, 2025 cyclenola.gov
